Lockhart Hall - Signage installation
Thu. Apr. 30 08:00 AM
- Thu. Apr. 30 04:00 PM
Location: 6th floor
Please be advised that contractors will be on site on April 30th to install the new ¶¡ÏãÔ°AV sign in Lockhart Hall. As part of this work, contractors will need access to the 6th floor in order to reach the roof. Additionally, a portion of the pedestrian walkway on Ellice will be temporarily blocked during the installation.